Chapters in this video
- 0:00 Introduction to Low-Threshold Shower Installation This video provides visual guidance for installing a low-threshold 3-piece shower, emphasizing the importance of referring to the installation manual.
- 0:24 Dry Assembly and Pre-Installation Checks The installer dry assembles the modular shower to ensure correct panels, drain location, and proper alignment before moving it into the bathroom space.
- 1:54 Preparing the Framing Pocket and Subfloor The installer checks the framing pocket for proper sizing, square, plumb, and level, making necessary adjustments and inspecting the subfloor for integrity.
- 4:07 Installing the Drain Body and Base Support The installer installs the drain body, prepares the drain to meet local plumbing codes, and applies silicone adhesive for proper support and adhesion of the base.
- 5:53 Permanently Installing and Securing the Base The installer permanently positions and levels the shower base, securing it to all available studs and cutting the drain pipe even with the rubber gasket.
- 7:22 Installing the Wall Panels and Valve The installer installs the wall panels using a pin and slot system, then installs the valve, connecting the hot and cold water supply lines.
- 10:19 Finishing Touches and Accessories The installer caulks all seams, recommends client involvement for accessory placement, and suggests an optional flange trim molding kit for a seamless transition.
A technician demonstrates the step-by-step installation of a low-threshold, three-piece shower. Customers learn how to properly prepare the space and install the base for a secure and level fit.
Video transcript
Generated from the video's audio, so a word here and there may be off. Chapters above jump to the matching moment.
this installation video provides a visual guidance for the installation of a low threshold 3-piece shower please refer to the installation manual for specific details relating to the installation of your shower now is the time to dry assemble your modular shower prior to moving into the bathroom space this procedure can be performed on any clean dry and open space this is an important step for ensuring that you have received the correct panels you've received the correct drain location the panels and pan are free from damage and defect and the panels align properly when assembled prior to installing in the framing pocket take a picture of the unit now the purpose and benefit will be covered in a later step the note it is a wise choice to delay demolition of the existing bathtub area until you're confident that your new unit is the correct size and and condition you will not want your customer to be without a working bathroom while waiting for a replacement remember slow is fast the following is a list of the required tools the following is a list of the materials needed check the framing pocket to ensure it is sized properly with the dimensions provided on the framing diagrams page in your installation instructions next check the pocket for square plumb and level and make the necessary adjustments no it is more common than not that adjustments will need to be made to start by hanging a plumb bob from the framing beginning of the back wall this is critical to your installation in this demonstration the wall was not plumb a solution is to either shim the pan away from the wall or notch the stud this is critical to a proper installation of the back wall panels slight variances will affect plumb walls and uneven grout lines inspect the subfloor for level and structural integrity a solid non flexing subfloor is required strengthen and replace any weak or damaged subfloor materials dry fit your shower base to ensure it fits in the frame properly ensure pocket is clean from all debris pre position three short lengths of half-inch PVC plastic pipe as slider rails or shoehorns in the framing pocket lower the shower base at a 45 degree angle on to the PVC pipe as shown this will assist greatly on sliding the base into the framing pocket depending on your room configuration and clearances it may be necessary to cut additional drywall to provide enough clearance to install the pan level the base temporarily ensuring the bubble is perfectly centered like the foundation to a home this is vital to the walls installing properly resulting in consistent grout lines fasten the base to one stud on the center of the back wall with one screw remember you may need to shim the base out away from the stud to ensure the walls can be installed properly once level draw a line on the subfloor indicating the front point of the threshold this will provide a visual cue for a later step when permanently installing the base remove temporary screw and pull the shower base back out of the framing pocket now it is time to install the drain body remove the inside neoprene gasket and compression ring from the drain and set aside for a later step install the 2 inch no cult shower drain body on the pan with plumber's putty tighten the nut until snug and excess putty squeezes out around the flange remove excess prepare drain to meet local plumbing codes the details for the drain core area can be found in the instructions on the framing diagrams page step out and extend the drain pipe two to four inches above the floor this will be trimmed at a later step the base is manufactured with a built-in back leg support during the dry fit procedure you'll notice the base does not sit level naturally the support leg is cut short to provide adjustment for unlevel floors proper installation requires solid contact between the bottom of the support leg and the subfloor as your warranty depends on it first measure the distance from the front apron to the center of the back leg now transfer that measurement from the previously marked line on the floor and using a straight edge mark line on the floor for the back leg next using approximately one tube of 100% clear silicone adhesive apply every two inches on your line as shown the adhesive should be applied at a height that ensures contact with the base as it set in place which means each bead of silicone should be at least one inch or greater and once the adhesive has cured this will provide proper support and adhesion between the pan and the subfloor with the base ready to install permanently position and line up the drain over the drain pipe slowly lower the base to level nudging in small movements until the base meets the line drawn on the floor from an earlier step check for level re secure the center screw to the stud wall note leaning into the shower can easily nudge your base out of level it is recommended to secure one screw into each wall rechecking level as you go the level base is crucial to wall assembly secure the pan to all available studs shimming were necessary countersinking number eight stainless steel screws this allows the screw head to be flush with the finished flange so as to not interfere with the finished wall installation cut the drain pipe even with the top of the rubber gasket using an inside pipe cutting tool the using plumbers grease lubricate the inside of the rubber gasket and slide over the drain pipe with beveled edge facing up push down until it sets itself then screw compression ring into place until tight then snap the grid drain into place place protection on the floor to prevent scratches and deems to the finish while completing the assembly process the protection can be cut from the cardboard packaging as the example shown here it is now safe to step into the shower for the next steps now it's time to install the wall opposite the valve your shower features a pin and slot system that enables you to install all panels from the front finish side without requiring rear access begin by using the 100% silicone adhesive applying to the base ledge as shown encircling the single pin and any shipping bolt holes on the ledge lift wall panel into place guiding the wall over the alignment pin check alignment of the tile grout line and before screwing flange to studs inspect the gap seams in the corners and on the base the gaps should match the picture taking them the dry fit procedure if there is a larger gap this means the base is not level or the back wall is not square and plumb now is the time to correct secure wall to studs with screws shimming were necessary to ensure wall surfaces are flush before installing the valve wall we must first install the valve refer to the valve manufacturer's instructions for conventional Sweatt installations for this demonstration we'll be installing a valve with PEX connections first find the desired location of your valve and apply protective masking tape over the area to be cut mark the center of your valve and drill a hole in the diameter listed in your valve instructions mount the valve directly to the panel by connecting the front trim plate to the valve body using the mounting screws provided by the valve manufacturer next mount the supply outlet to the sharkbite eared elbow note if your existing shower supply is higher than the new shower wall panel leave in place and then connect to your new the framing call has been prepared to receive PEX pipe in the looped pattern to prevent kinking and allow ease of connection from the valve to the water supplies using the 100% silicone apply to all interior seams rest the panel on a bucket as shown during water connection to avoid chipping the panel or the pan connect the hot and cold water Peck supply lines using hex crimps or sharkbite push-on fittings notice the installers are using 90 degree fittings which work best in this application while the wall was resting on the bucket and fully connected now is the time to turn the water back on and test for leaks install panel by starting at the sender seam rotating the wall into place check alignment of the tile grout line then secure wall to studs with screws shimming were necessary to ensure wall surfaces are flush your shower is fully reinforced and ready to receive surface mount accessories now or anytime in the future it is highly recommended that the client be involved in identifying the ideal placement of accessories according to their needs always mark drill and call in a circular pattern around pilot holes for all accessories the unit is designed to allow a 1/8 inch gap at the seams caulk all seams as well as the front edge of the threshold and do not use your shower until caulk is cured see caulk instructions for a cure time a premium caulk is recommended for fast to day installations a 3 inch white flange trim molding kit is an available option that transitions the drywall to the shower covering the gap during the removal of your existing tub or shower it's recommended that you cut the wall board away approximately 1 inch beyond the perimeter or outside edge of the nailing flange of your shower unit this step will minimize the amount of drywall patching required congratulations you've successfully installed your low threshold shower providing years of safety and independence endings
Guides that use this video
- 📖Installing Ella Shower Bases, the Flexible Shower Dam, and Shower WallsShowers, Panels & Accessories
- 📖Installing an Ella One-Piece AcrylX Shower Stall: Alcove Prep, Drain Opening, Fastening and First UseShowers, Panels & Accessories
- 📖Installing the 60 x 33 Three-Piece Low-Threshold Shower With Molded Seat (Liberty 24 and 36)Showers, Panels & Accessories
- 📖Ella Shower Stalls Compared: One-Piece AcrylX E-Series, Three-Piece 60x33 Molded Seat, and the Legacy ESM Gel Coat StallsShowers, Panels & Accessories
- 📖Every Shower Video in One Place: Low-Threshold and Barrier-Free Installs, the Shower Dam, Shower Bases, Cultured Marble Walls, CNC Wall Kits and Grout-Free PVC TileShowers, Panels & Accessories
- 📖Warranty Coverage for Ella Shower Bases: 30-Year Limited Terms and the 10-Day Claim WindowWarranty & Registration
- 📖Warranty Terms for Showers, Shower Doors, Seats, Faucets, Alcove Tubs and the Pet Spa: What Each Published Document SaysWarranty & Registration