Support Center / Installation & Leveling / How Do You Install a Walk-In Shower Base and Walls?
Back to Installation & Leveling

How Do You Install a Walk-In Shower Base and Walls?

Updated November 2026

Installing a walk-in shower from an Ella kit is a sequence of five jobs: preparing a sound, level floor and framing pocket, dry fitting the base and setting the drain, bedding the base on silicone adhesive, hanging the wall panels, and cutting the valve openings and connecting the plumbing. Ella ships the base, walls, grab bars and drain, and a local licensed plumber or contractor does the installation with Ella's technical support available for questions along the way. The floor work is laid out in How Do I Install an Ella Shower Base on a Wood Subfloor?, and this page puts the whole project in order from the carton to the first shower.

Step 1: Know What Arrives and What You Still Need

A basic Ella walk-in shower kit includes the shower stall itself, the set of grab bars listed for that kit, and the drain. The grab bars are packed loose rather than pre-installed, and the stall arrives as one piece or several pieces depending on the model. The kit does not include a shower head, a hand shower, a mixing valve or valve trim, and the wall arrives solid with no valve cutout. The rough-in piping and fittings behind the wall come from your installer, and if your project starts from a shower base rather than a full stall, confirm whether the walls are included, because Ella sells bases, walls and filler pieces as separate items. What is included in a basic DIY walk-in shower kit? turns the carton list into a shopping checklist.

Choose the shower valve with your plumber before the carton arrives, and if you want a hand shower on a slide bar, choose that hardware at the same time so the wall openings can be planned together and cut once. The installation manual for your kit is published with the product listing and is also available from the team at (800) 480-6850, so the whole procedure can be read before anything is unpacked. Two material notes affect the crew you need: the AcrylX three-piece kits have a self-supporting, pre-leveled base that needs no mud set, while the cultured marble shower bases are heavy and require at least two people to install.

Step 2: Prepare the Floor and the Framing

Ella shower bases install on either a concrete or a wooden subfloor, so a wood floor needs no special base. What matters is that the subfloor is sound and that the surface is flat and level within 1/8 inch. Soft or water-stained wood is repaired first, because the base bears directly on the floor and cannot bridge a weak spot. Dips are corrected with leveling compound, allowed to harden fully, rather than with a mortar bed. The acrylic base's high-density foam reinforcement is designed to bear on a hard, level surface, and a mud bed defeats that design.

Check the framing pocket at the same time. The barrier-free roll-in gel coat manual calls for a pocket 1/4 inch larger than the shower, with the framing square, plumb and level, and its framing table gives the width, drain offset and depth for each unit. Have your plumber locate the supply lines and the drain before the base is positioned. On an acrylic base the drain position is molded in and cannot be moved afterward, so the floor drain has to be where the base expects it.

Step 3: Dry Fit the Base and Set the Drain

  1. Dry fit the base in the framing pocket and level it. On a multi-piece gel coat unit, dry assemble the whole shower in an open space first to confirm the panels, the drain location and the alignment before moving it into the bathroom.
  2. Mark the front of the threshold on the floor so the base can go back exactly where it was leveled.
  3. Pull the base back out and set the 2 inch drain body according to the drain manufacturer's instructions.
  4. On a barrier-free roll-in gel coat unit, follow the manual's drain detail: a 6 inch drain core with a 10 by 10 by 1/2 inch recess.

Step 4: Set the Base for Good

Where your model has wood shims or a support leg under the back edge, they must make solid contact with the subfloor. On the low-threshold gel coat units the wood support wedges are mandatory, not optional. The base is then bedded on beads of 100 percent silicone adhesive rather than mortar and set back onto the marks made during the dry fit. Level it again before the adhesive sets. A base that rocks or sits out of level will not drain correctly, because every Ella base relies on the slope molded into its floor to carry water to the drain.

Step 5: Hang the Walls and Cut the Openings

Ella's standard wall panels are acrylic, manufactured at a consistent 98 inch height. In the three-piece kit the two side panels measure 40 inches wide and the back wall panel measures 60 inches wide, and larger panels are offered so a kit can be matched to the width of the base and the height of the room. The panels come in plain white, a CNC routed design with light gray grout lines, and a digital print option. The kits use acrylic and fiberglass construction that meets or exceeds the UPC, IPC, ANSI Z124.1, NAHB, HUD and FHA requirements and carry a 30-year limited warranty, as explained in What is an acrylic shower and how durable is it?.

The second wall family is the cultured marble travertine surround, a natural quartz and granite composite with a gel coat surface. These panels come as multi-piece surrounds of eight, six or four panels, each light enough to be carried and installed by one person, and they are glued directly over drywall, plaster, painted walls, Durock cement board or even existing tile, so a remodel does not always have to start with demolition. What Are Ella Shower Wall Panels Made Of, and Do They Off-Gas? compares the two families.

Whichever walls you choose, the valve and shower head openings are marked and cut during installation, not at the factory. The correct location depends on the valve you selected, the rough-in behind the wall and the needs of the person using the shower, which is why the wall ships without a preset height or offset. Your plumber connects the drain that came in the box to the house waste line, sets the valve, fits the trim, shower head and any hand shower, and the grab bars from the kit go on last.

Who Does the Work and Where to Get Help

Ella manufactures and ships the shower but does not install it. A local licensed plumber or contractor does the work, and Ella's technical support answers their questions along the way, with the manual as the reference. If a step in your manual differs from the general sequence here, the manual for your specific kit wins. Keep your order details handy so the team can identify the exact base and wall set when you call (800) 480-6850 or open a ticket at ellasbubbles.com/support.

Video
Chapters in this video
  1. 0:00 Receiving and Inspecting Your Shower The video provides visual guidance for installing a barrier-free five-piece shower, emphasizing the importance of inspecting the unit upon arrival and noting any damage.
  2. 1:32 Dry Assembling Your Modular Shower The installer dry assembles the modular shower in an open space to ensure correct panels, drain location, and proper alignment before moving it to the bathroom.
  3. 3:04 Preparing the Framing Pocket and Subfloor The installer checks the framing pocket for proper sizing, squareness, plumb, and level, making necessary adjustments and inspecting the subfloor for integrity.
  4. 4:05 Installing the Shower Pan and Drain The installer cleans the pocket, dry fits and levels the pan, installs the drain body, and adheres the pan to the subfloor using silicone adhesive and bracing.
  5. 7:40 Assembling and Securing Shower Panels The installer places protection on the floor, caulks the pan ledge, and installs the lower and upper back panels, securing them to the studs.
  6. 8:31 Installing the Valve Wall and Plumbing The installer caulks the pan ledge and vertical back wall seam, sets the panel, drills holes for the valve and supply outlet, and connects the PEX supply lines.
  7. 11:05 Adding Accessories and Finishing Touches The installer marks, drills, and caulks around pilot holes for accessories, then caulks all seams and the front edge of the threshold, recommending a water retainer and shower curtain.
Video
Chapters in this video
  1. 0:00 Receiving and Inspecting Your Shower This chapter explains how to receive and inspect your shower unit upon arrival, including what to do if there is damage.
  2. 1:17 Dry Assembling Your Shower This chapter demonstrates how to dry assemble your modular shower to ensure all panels and the drain are correct and undamaged.
  3. 2:49 Preparing the Framing Pocket This chapter shows how to check and adjust the framing pocket for proper sizing, squareness, plumb, and level.
  4. 5:02 Installing the Drain Body This chapter guides you through installing the drain body and preparing the drain to meet local plumbing codes.
  5. 5:44 Permanently Installing the Base This chapter details how to permanently install the shower base, ensuring it is level and properly supported.
  6. 8:12 Installing the Wall Panels This chapter demonstrates installing the wall panels using the pin and slot system, starting with the wall opposite the valve.
  7. 9:13 Installing the Valve and Wall This chapter shows how to install the valve and then the valve wall panel, including connecting the water supply lines.
  8. 11:13 Finishing and Sealing the Shower This chapter covers installing surface mount accessories, caulking all seams, and the option of adding a flange trim molding kit.
Video
Chapters in this video
  1. 0:00 Introduction to Low-Threshold Shower Installation This video provides visual guidance for installing a low-threshold 3-piece shower, emphasizing the importance of referring to the installation manual.
  2. 0:24 Dry Assembly and Pre-Installation Checks The installer dry assembles the modular shower to ensure correct panels, drain location, and proper alignment before moving it into the bathroom space.
  3. 1:54 Preparing the Framing Pocket and Subfloor The installer checks the framing pocket for proper sizing, square, plumb, and level, making necessary adjustments and inspecting the subfloor for integrity.
  4. 4:07 Installing the Drain Body and Base Support The installer installs the drain body, prepares the drain to meet local plumbing codes, and applies silicone adhesive for proper support and adhesion of the base.
  5. 5:53 Permanently Installing and Securing the Base The installer permanently positions and levels the shower base, securing it to all available studs and cutting the drain pipe even with the rubber gasket.
  6. 7:22 Installing the Wall Panels and Valve The installer installs the wall panels using a pin and slot system, then installs the valve, connecting the hot and cold water supply lines.
  7. 10:19 Finishing Touches and Accessories The installer caulks all seams, recommends client involvement for accessory placement, and suggests an optional flange trim molding kit for a seamless transition.

Common Questions

Can an Ella shower base be installed on a wood subfloor?
Yes. Ella bases are designed for either a concrete or a wooden subfloor. On wood the subfloor must be sound, flat and level within 1/8 inch, with dips corrected by leveling compound that has fully hardened before the base is set.
Do I need a mortar bed under the shower base?
No. The acrylic base's high-density foam reinforcement is designed to bear on a hard, level surface, and the AcrylX three-piece kits have a self-supporting, pre-leveled base. The base is bedded on beads of 100 percent silicone adhesive, and any low spots are fixed with leveling compound rather than a mud bed.
Does the shower kit include the valve and shower head?
No. The kit includes the stall, the grab bars listed for it, and the drain. The shower valve, trim, shower head, hand shower and slide bar are bought separately, and the wall arrives solid so the openings can be cut around the valve you choose.
Can the wall panels go over my existing tile?
The cultured marble travertine panels are glued directly over drywall, plaster, painted walls, Durock cement board or existing tile. For the acrylic panels, follow the installation manual published with your kit, and ask the team at (800) 480-6850 if your wall condition is not covered.
How many people does it take to install the shower?
It depends on the materials. The cultured marble bases are heavy and require at least two people, while each cultured marble wall panel is light enough for one person to carry and install. Multi-piece gel coat units are dry assembled in an open space first, which is easier with a helper.
Will Ella install my walk-in shower for me?
No. Ella ships the shower and provides technical support, but a local licensed plumber or contractor does the installation. The team answers your installer's questions and the installation manual for your kit is available from the product listing or from the team.

About this guide. Answers in the Ella's Bubbles Ella's Bubbles Walk-In Tub Support Center are compiled from real conversations with owners, our technicians’ notes and the product documentation, then reviewed by our team. Models and options have evolved over the years, so a detail here may differ slightly from yours. If something looks different on yours, send us your serial number and a specialist will confirm it for your model.

Was this helpful?

Did this solve your question?

If not, open a ticket and our team will pick it up from here.

Open a Support Ticket