Print this page and tick each line with your installer before they leave. The lines come from the water test in the owner's manual and the 16 checks on the warranty activation form. The reasons behind each check are in what your installer should test before leaving.
Before the Walls Close: The Water Test
Required before the walls close; the full procedure is in the pre-installation water test.
- u2610 Tub on a flat, level surface where it can drain
- u2610 Door seal wiped clean with a clean rag and warm water
- u2610 Drains taped closed
- u2610 Filled to at least 3 inches above the highest jet (to the bottom of the grab bar if no jets)
- u2610 Water left standing 30 minutes; all plumbing and seals inspected
- u2610 All electrical components run another 30 minutes on rated three-prong cords in separate outlets; unions at pump and heater inspected again
The 16 Activation-Form Checks
- u2610 Tub level in all directions, all support legs touching the ground
- u2610 Installed by a licensed electrician
- u2610 Installed on a dedicated GFCI circuit breaker
- u2610 Frame of the tub properly grounded
- u2610 Door seal cleaned with rubbing alcohol
- u2610 Temperature control valve operated on both hot and cold (where your faucet package includes one)
- u2610 Both diverters function properly
- u2610 Hand shower works on all settings without leaking
- u2610 All supply lines checked for leaks with both diverters on
- u2610 Drains open and close properly
- u2610 Locking nut tightened on both stoppers
- u2610 Door seal watertight after the tub has been filled for at least 20 minutes
- u2610 Hydro and air pumps run at least 20 minutes; all connections to pumps and jets watertight
- u2610 Chromatherapy light and ozone sterilization working (ozone alone makes a light hum, which is normal)
- u2610 All drain fittings checked for leaks while the tub is draining
- u2610 Unit installed with access to both plumbing and electrical connections
Documents to Collect Before the Installer Leaves
- u2610 Activation form, both pages, signed by you and by the installer
- u2610 Installer's electrician license and insurance information
- u2610 Copy of your sales receipt from where you purchased
- u2610 Model and serial number from the label inside the front apron access panel (on many models, the panel next to the door)
- u2610 Photos of the dry floor under the door during the 20 minute fill, the breaker label and the frame ground
Submit the form promptly; see how to activate your warranty and what the activation form is.

Chapters in this video
- 0:00 Unboxing and Initial Inspection The video shows the unboxing of an Ella's Bubbles walk-in tub and the initial inspection for any shipping damage.
- 0:49 Pre-Installation Leak Check The tub is filled outside to check for leaks and all pumps are run to ensure proper function before installation.
- 1:11 Drain and Water Supply Connections The installer modifies the floor for the oversized drains and connects the water supply lines with shut-off valves.
- 2:10 Electrical and Leveling A licensed electrician adds proper breakers and GFCI outlets, and the tub's adjustable legs are used for leveling.
- 2:47 Final Checks and Finishing Touches After all connections are secure, the tub is filled to check for leaks, and the side panels are replaced and sealed.
Here an installer fills the tub outside and runs all pumps to check for leaks, levels it on the legs, then fills and runs everything again after connection before replacing the panels. Watch: Walk-In Tub Installation and Delivery Ella's Bubbles Transfer 60 with chapters and a full transcript.
What to Do If a Line Cannot Be Ticked
Leveling comes first: if the door does not close smoothly, re-check every leg with the leveling guide. A weeping union is normally an over-tightened or shifted O-ring, not a defect; re-seat the O-ring and reassemble snugly. For anything you cannot resolve or verify, open a request at ellasbubbles.com/support with photos and the serial number, or call your Ella dealer or the team at (800) 480-6850. Your first days as an owner are in the new owner first week checklist.