Support Center / Showers, Panels & Accessories / Installing Multi-Piece Gel Coat Showers: Barrier-Free Roll-In (BF) and Low-Threshold (SH) Units
Back to Showers, Panels & Accessories

Installing Multi-Piece Gel Coat Showers: Barrier-Free Roll-In (BF) and Low-Threshold (SH) Units

Updated September 2026

Installing a multi-piece gel coat shower from Ella's Bubbles follows one of two manuals. Barrier-free roll-in (BF) units need a framing pocket 1/4 inch larger than the shower, a floor within 1/8 inch of level, a 6 inch drain core with a 10 x 10 x 1/2 inch recess, and two installers. Low-threshold (SH) units rest on wood support wedges that are mandatory, are joined with silicone at every seam, fastened with 6d galvanized screws every 8 inches on center, and leak-tested before the wallboard goes on. Receiving, the dam and the general base overview are covered in installing shower bases, the flexible dam and shower walls; the three-piece molded-seat shower and the one-piece AcrylX stall are covered separately.

Which Units These Manuals Cover

Numbered diagram of a five-piece Ella shower kit showing four wall panels and the seated base
A five-piece kit: four wall panels indexed to the base by the slot-and-pin system.

Barrier-free roll-in: 3838 BF 4P, 4836 BF 4P, 5050 BF 4P, 5430 BF 4P, 6030 BF 5P, 6033 BF 5P, 6036 BF 5P, 6048 BF 5P, 6060 BF 3P and 5P, 6232 BF 5P and 6238 BF 5P, with center or right/left drains. The framing table in the manual gives width, drain offset and depth for each; for example the center-drain 6033 frames at 60 1/4 inches wide by 33 5/8 inches deep, and the center-drain 6036 at 60 1/4 by 37 1/4.

Low-threshold gel coat: 3648 SH 1S 3P, 4836 SH 4P, 6030 SH 5P, 6032 SH 1S 3P and 6033 SH 5P, in three, four and five-piece configurations.

Handling Rules for Every Gel Coat Unit

  • The back of a fiberglass unit is not waterproof. Store it so water drains off; a soaked back can bulge the gel coat.
  • Most damage comes from impact to the back. Never drag or drop the unit, not even an inch, or stress cracks follow. Carry it with two people or a two-wheel dolly.
  • Keep cardboard or a drop cloth on the floor and seat while you work, and never clean gel coat with metal tools or razor blades.
  • Inspect on delivery and report damage within 48 hours following the freight damage steps; a damaged unit must never be installed.

Barrier-Free Roll-In Units

Barrier-Free Five Piece Shower Installation
Chapters in this video
  1. 0:00 Receiving and Inspecting Your Shower The video provides visual guidance for installing a barrier-free five-piece shower, emphasizing the importance of inspecting the unit upon arrival and noting any damage.
  2. 1:32 Dry Assembling Your Modular Shower The installer dry assembles the modular shower in an open space to ensure correct panels, drain location, and proper alignment before moving it to the bathroom.
  3. 3:04 Preparing the Framing Pocket and Subfloor The installer checks the framing pocket for proper sizing, squareness, plumb, and level, making necessary adjustments and inspecting the subfloor for integrity.
  4. 4:05 Installing the Shower Pan and Drain The installer cleans the pocket, dry fits and levels the pan, installs the drain body, and adheres the pan to the subfloor using silicone adhesive and bracing.
  5. 7:40 Assembling and Securing Shower Panels The installer places protection on the floor, caulks the pan ledge, and installs the lower and upper back panels, securing them to the studs.
  6. 8:31 Installing the Valve Wall and Plumbing The installer caulks the pan ledge and vertical back wall seam, sets the panel, drills holes for the valve and supply outlet, and connects the PEX supply lines.
  7. 11:05 Adding Accessories and Finishing Touches The installer marks, drills, and caulks around pilot holes for accessories, then caulks all seams and the front edge of the threshold, recommending a water retainer and shower curtain.

This tutorial follows a barrier-free five-piece unit from receiving inspection through the finished stall: checking the pocket for square, plumb and level, inspecting the subfloor, dry fitting and marking the threshold line, setting the drain, bedding the pan in adhesive, bracing it while the adhesive cures, and hanging the wall panels from the front on the pin-and-slot system. Pair it with these manual points: Watch: Barrier-Free 5-Piece Low-Threshold Shower Installation u2013 Complete Tutorial with chapters and a full transcript.

  1. Frame the pocket to the diagram, which is 1/4 inch over the shower size for maneuvering; closer is allowed if 1/4 inch is unreasonable. Doubling the front studs adds strength. The design allows a 1/8 inch gap at the seams.
  2. The floor must be flat and level; anything over 1/8 inch out of level will prevent a successful installation. Float it with leveling compound and let it cure before proceeding.
  3. Provide a 6 inch core for the drain pipe and a 10 x 10 x 1/2 inch deep recess in the subfloor around it to assure drainage; the core is blocked when the area is filled with thin-set.
  4. Plan the control valve: on a two-piece back wall keep the valve clear of the seam and mounting flange.
  5. Do a full dry fit (minimal screws, no silicone or adhesive) through the wall steps first. Check every section against a straight edge; shipping can bow a panel slightly and it must be pressed back straight.
  6. Bed the pan: trowel solid wood flooring adhesive or 100 percent silicone over the entire pan contact area with a 1/2 inch notched trowel, fill the drain box with non-shrink thin-set (not above the floor line), rotate the pan into place, walk it into the adhesive and screw the flange to the studs with pan-head screws, snug but not tight. Adhesive working life is roughly an hour, so continue straight through the remaining steps.
  7. Before the adhesive cures, confirm the ledges are level and that the floor slopes to the drain in every direction with no humps or dips.
  8. Set the back wall first, then the side walls, indexed by the slot-and-pin system and pushed tight before fastening. Complete the valve and supply connections while the valve wall is still off; this is the last access to the plumbing. Two persons are required.
  9. The collapsible dam that ships with roll-in bases has its own instructions in the shower base and dam article.

Low-Threshold (SH) Units

Barrier-Free 5-Piece Low-Threshold Shower Installation
Chapters in this video
  1. 0:00 Receiving and Inspecting Your Shower This chapter explains how to receive and inspect your shower unit upon arrival, including what to do if there is damage.
  2. 1:17 Dry Assembling Your Shower This chapter demonstrates how to dry assemble your modular shower to ensure all panels and the drain are correct and undamaged.
  3. 2:49 Preparing the Framing Pocket This chapter shows how to check and adjust the framing pocket for proper sizing, squareness, plumb, and level.
  4. 5:02 Installing the Drain Body This chapter guides you through installing the drain body and preparing the drain to meet local plumbing codes.
  5. 5:44 Permanently Installing the Base This chapter details how to permanently install the shower base, ensuring it is level and properly supported.
  6. 8:12 Installing the Wall Panels This chapter demonstrates installing the wall panels using the pin and slot system, starting with the wall opposite the valve.
  7. 9:13 Installing the Valve and Wall This chapter shows how to install the valve and then the valve wall panel, including connecting the water supply lines.
  8. 11:13 Finishing and Sealing the Shower This chapter covers installing surface mount accessories, caulking all seams, and the option of adding a flange trim molding kit.

The tutorial opens with receiving and inspection, then shows the dry assembly in a clean open space (correct panels, correct drain location, no damage, panels align), the pocket checked with a plumb bob, the base slid in on PVC rails, temporarily leveled and screwed at a center stud, a threshold line marked, the 2 inch no-caulk drain set in putty, and the base set permanently on silicone beads with the drain aligned. The manual steps for the low-threshold units: Watch: Barrier-Free 5-Piece Low-Threshold Shower Installation u2013 Complete Tutorial with chapters and a full transcript.

  1. Locate the provided wood shims under the back edge of the base. It is mandatory that these wedges are in place and in proper contact with both the unit and the subfloor; they give the base its structural support.
  2. Install the drain with a bead of 100 percent silicone around the opening. Measure, mark and cut the valve and shower head holes with 1/4 inch pilot holes and a hole saw.
  3. Silicone every joint. Set the base, level it in two directions on the apron and the top of the wall, fill any gap under the apron with solid material, and fasten to each stud with 6d galvanized screws through the flanges.
  4. Run a continuous bead of silicone along the base between the edge and the fastener holes and up the vertical seams. Set the walls on the pins: on three-piece units the left wall then the right; on four-piece units the back wall first, then the left and right, with the wet wall last. Press the seams tight and wipe excess before it cures.
  5. Fasten the wall assembly every 8 inches on center along the vertical flanges and to each stud along the top.
  6. Connect supply and drain lines, strap them, install trim, and check for leaks before installing wallboard and closing off plumbing access.

Warranty Notes

The barrier-free manual prints a 30 year limited warranty against manufacturing defects, with supplied component parts covered for one year, voided if the unit is moved from its first installation or installed contrary to the instructions. The low-threshold gel coat manual prints a three year term for its gel coat units. Confirm the term for your specific unit with the team when you register it, and see warranty coverage for Ella shower bases for the 10-day claim window. Care after installation is in caring for Ella showers.

Common Questions

How much bigger than the shower is the pocket?
For barrier-free roll-in (BF) multi-piece gel coat showers, the framing pocket needs to be 1/4 inch larger than the shower unit for maneuvering room. For low-threshold (SH) units, the framing page in the manual provides specific dimensions for each unit, such as the 60 1/4 inches wide by 33 5/8 inches deep for the center-drain 6033 SH unit.
How flat does the floor need to be?
For barrier-free roll-in (BF) multi-piece gel coat shower bases, the subfloor must be flat and level within 1/8 inch. If the floor is out of level by more than 1/8 inch, it will prevent a successful installation and can lead to drainage problems because the base is glued to the entire floor contact area. You should float the subfloor with leveling compound and allow it to cure before proceeding with the installation.
Why are the wedges mandatory?
The wood support wedges are mandatory for low-threshold (SH) multi-piece gel coat shower bases because they carry the back edge of the base and provide structural support. Without proper contact between the wedges, the unit, and the subfloor, the base can flex, causing the caulked seams to separate and potentially leading to leaks.
How many installers does a multi-piece gelcoat shower need?
Installing a multi-piece gel coat shower, whether a barrier-free roll-in (BF) or low-threshold (SH) unit, requires two installers. This ensures the unit can be carried safely without damage and allows for the proper setting and alignment of the indexed wall panels using the slot-and-pin system.
When is the leak test?
The leak test for a multi-piece gel coat shower should be performed after all plumbing connections are made and before the wallboard is installed. This timing is crucial because the valve wall is the last point of access to the supply lines, allowing for any necessary adjustments or repairs before the plumbing is closed off.
In what order do the wall panels go on?
For barrier-free roll-in (BF) multi-piece gel coat showers, the back wall panel is installed first, followed by the side wall panels. For low-threshold (SH) units, the order depends on the configuration: for three-piece units, install the left wall then the right; for four-piece units, install the back wall first, then the left and right side walls, with the wet wall installed last.
Can I set the base in mortar instead of adhesive?
No, you should not set a multi-piece gel coat shower base in mortar. The manual for barrier-free roll-in (BF) units specifically calls for solid wood flooring adhesive or 100 percent silicone to be troweled over the entire pan contact area, with non-shrink thin-set used only to fill the drain box. Following the installation instructions precisely is essential to maintain the product's warranty.
Where do the grab bars and seat go?
Surface-mount accessories, such as grab bars and seats, are added to multi-piece gel coat showers after all seams have cured. It is recommended to involve the user in the placement of these accessories to ensure they are installed in locations where they will be most needed and provide optimal support.

For anything specific to your unit or configuration, open a ticket at ellasbubbles.com/support.

About this guide. Answers in the Ella’s Bubbles Support Center are compiled from real conversations with tub owners, our technicians’ notes and the product documentation, then reviewed by our team. Tub models and options have evolved over the years, so a detail here may differ slightly from your exact tub. If something looks different on yours, send us your serial number and a specialist will confirm it for your model.

Did this solve your question?

If not, open a ticket and our team will pick it up from here.

Open a Support Ticket