In the Ella's Bubbles line, a stall shower is a factory-made shower unit, a base with its surrounding walls, that arrives either as one molded piece or as sections your installer assembles in the bathroom. It is a dedicated place to shower rather than a bathtub with a faucet package, and the kit ships with the stall, its grab bar set and the drain, while the valve and shower head are chosen separately. The full packing list is in What Comes in the Box With an Ella Shower Kit, and What You Still Need to Buy.
What Makes a Shower a Stall
A stall is the whole shower enclosure delivered as a product: the floor you stand on and the walls around it are made to fit each other. On a one-piece Ella shower, the base and walls are a single molded unit that cannot be broken down. On a multi-piece stall, the same enclosure is divided into sections. The 5-piece stall, for example, is a base plus four wall sections that assemble on site.
Ella shower stalls are built as accessible residential showers. They have a low step-in and factory grab bars, and some configurations have a seat. The grab bars are packed loose in the carton, not pre-installed, so your installer mounts them during installation by fastening them into the reinforced backing built into the wall panels with the correct screws.
What a stall does not decide for you is the plumbing trim. The wall arrives solid, with no opening for a valve or shower head and no preset height or offset. Your plumber marks and cuts those openings on site, because the right location depends on the valve you choose, the rough-in behind the wall and the needs of the person using the shower.
How the Ella Stall Types Differ from One Another
The biggest difference between one stall and another is how many pieces it arrives in. That single detail decides whether it can reach your bathroom and which options you can specify.
| Stall type | How it is built | Getting it into the room | Seating and options | Best for |
|---|---|---|---|---|
| One-piece stall | A single molded unit that cannot be broken down | Every opening on the route needs at least 33 inches of clear opening, and a wider stall needs correspondingly wider openings | Seat side, drain side and number of grab bars are confirmed before production | New construction, where the shower is set before doorways and hallways are finished |
| Three-piece stall | Ships as separate sections | The sections pass through ordinary doorways, and the base turns sideways | not listed | Finished homes with ordinary doorways |
| 5-piece stall | A base plus four wall sections that assemble on site | not listed | Soap ledges, a bench, and grab bars in a 24-inch or 36-inch length. No molded seat. A 17 5/8 inch foot ledge is molded into the base | Projects where ledges, a bench and a chosen grab bar length matter |
What this means for your bathroom: start with the route, not the style. Most finished homes have at least one opening narrower than 33 inches, which is why the one-piece stall is aimed at new construction. If one tight doorway, hallway or stairway stands between the delivery point and the bathroom, a sectional stall is the practical choice. The steps for walking that route with a tape measure are in How Do I Measure Doorways and Hallways for a One-Piece Ella Shower?. If seating is the priority, note that the 5-piece stall offers a bench, not a seat formed into the base, and its foot ledge cannot be left off. The ordering choices are explained in Ordering the 5-Piece Shower Stall With Soap Ledges, a Bench, or Grab Bars.
How a Stall Differs from a Walk-In Tub
A walk-in tub is often ordered with an Ella faucet package that includes a hand shower, so the fixtures are part of the order. A shower kit is different. It is a stall, a grab bar set and a drain, and nothing in the box detaches for hand-held use. Before installation day, plan to have these on site:
- The shower valve and its trim, chosen with your plumber.
- The shower head, plus a hand shower and slide bar if you want one.
- The rough-in piping and fittings, which your installer supplies.
The drain that ships with the kit is connected to the house waste line by your plumber. Confirm that the drain position on the stall matches the rough-in in your floor, and on the 5-piece stall state whether you need a left-hand or right-hand drain when you order.
How a Stall Differs from an ADA Shower Compartment
A stall with grab bars and a low step-in is easy to mistake for a certified accessible shower, and the two are not the same thing. Ella shower stalls are not ADA compliant, and that answer applies to the stall as a complete unit. The ADA standards cover the compartment dimensions, the threshold height, the seat, the placement and strength of the grab bars, and the reach range for the controls. A shower is compliant only when the full configuration satisfies every applicable requirement.
For a private residence, ADA certification is generally not a building code requirement, and most homeowners choose an Ella shower for its practical accessibility features. For a commercial building, a rental unit that falls under accessibility rules, or any project inspected against the standard, confirm the requirement with your local code official before you order. The details are in Are Ella Shower Stalls ADA Compliant?.
What Owning a Stall Is Like
Because a one-piece stall cannot be broken down, the team contacts you before the order goes to production. They confirm that you understand the shower is one piece and needs the clearance, and they confirm the seat side, the drain side and the number of grab bars you selected. They also check that the phone number on the order will be answered, because freight deliveries are scheduled by phone.
Care is simple, and the walls and floor use different tools:
- Walls: Soft Scrub applied with a cloth.
- Floor: Soft Scrub worked in with a brush across the whole surface, then a thorough rinse.
- Hard water stains: Goo Gone or rubbing alcohol.
- Avoid anything containing ammonia, bleach or Clorox, because those products make the gloss dull.
If the floor still looks dull after a proper cleaning, follow the steps in The Shower Floor Looks Dull or Dirty Compared to the Walls: How to Clean It. To decide which stall suits your project, ask your Ella dealer or the team at (800) 480-6850.
Related Guides
- Installing an Ella One-Piece AcrylX Shower Stall: Alcove Prep, Drain Opening, Fastening and First Use
- Will a Three-Piece Ella Shower Fit Through My Doorway? Piece Dimensions and Turning the Base Sideways
- Does the Ella Shower Stall Come With a Door, and What Size Door Fits the Opening?
Related Videos

Chapters in this video
- 0:00 Receiving and Inspecting Your Shower The video provides visual guidance for installing a barrier-free five-piece shower, emphasizing the importance of inspecting the unit upon arrival and noting any damage.
- 1:32 Dry Assembling Your Modular Shower The installer dry assembles the modular shower in an open space to ensure correct panels, drain location, and proper alignment before moving it to the bathroom.
- 3:04 Preparing the Framing Pocket and Subfloor The installer checks the framing pocket for proper sizing, squareness, plumb, and level, making necessary adjustments and inspecting the subfloor for integrity.
- 4:05 Installing the Shower Pan and Drain The installer cleans the pocket, dry fits and levels the pan, installs the drain body, and adheres the pan to the subfloor using silicone adhesive and bracing.
- 7:40 Assembling and Securing Shower Panels The installer places protection on the floor, caulks the pan ledge, and installs the lower and upper back panels, securing them to the studs.
- 8:31 Installing the Valve Wall and Plumbing The installer caulks the pan ledge and vertical back wall seam, sets the panel, drills holes for the valve and supply outlet, and connects the PEX supply lines.
- 11:05 Adding Accessories and Finishing Touches The installer marks, drills, and caulks around pilot holes for accessories, then caulks all seams and the front edge of the threshold, recommending a water retainer and shower curtain.

Chapters in this video
- 0:00 Receiving and Inspecting Your Shower This chapter explains how to receive and inspect your shower unit upon arrival, including what to do if there is damage.
- 1:17 Dry Assembling Your Shower This chapter demonstrates how to dry assemble your modular shower to ensure all panels and the drain are correct and undamaged.
- 2:49 Preparing the Framing Pocket This chapter shows how to check and adjust the framing pocket for proper sizing, squareness, plumb, and level.
- 5:02 Installing the Drain Body This chapter guides you through installing the drain body and preparing the drain to meet local plumbing codes.
- 5:44 Permanently Installing the Base This chapter details how to permanently install the shower base, ensuring it is level and properly supported.
- 8:12 Installing the Wall Panels This chapter demonstrates installing the wall panels using the pin and slot system, starting with the wall opposite the valve.
- 9:13 Installing the Valve and Wall This chapter shows how to install the valve and then the valve wall panel, including connecting the water supply lines.
- 11:13 Finishing and Sealing the Shower This chapter covers installing surface mount accessories, caulking all seams, and the option of adding a flange trim molding kit.

Chapters in this video
- 0:00 Introduction to Low-Threshold Shower Installation This video provides visual guidance for installing a low-threshold 3-piece shower, emphasizing the importance of referring to the installation manual.
- 0:24 Dry Assembly and Pre-Installation Checks The installer dry assembles the modular shower to ensure correct panels, drain location, and proper alignment before moving it into the bathroom space.
- 1:54 Preparing the Framing Pocket and Subfloor The installer checks the framing pocket for proper sizing, square, plumb, and level, making necessary adjustments and inspecting the subfloor for integrity.
- 4:07 Installing the Drain Body and Base Support The installer installs the drain body, prepares the drain to meet local plumbing codes, and applies silicone adhesive for proper support and adhesion of the base.
- 5:53 Permanently Installing and Securing the Base The installer permanently positions and levels the shower base, securing it to all available studs and cutting the drain pipe even with the rubber gasket.
- 7:22 Installing the Wall Panels and Valve The installer installs the wall panels using a pin and slot system, then installs the valve, connecting the hot and cold water supply lines.
- 10:19 Finishing Touches and Accessories The installer caulks all seams, recommends client involvement for accessory placement, and suggests an optional flange trim molding kit for a seamless transition.